Our Work

Montaje Parque Eólico “Els Escambrons”.

Lleida–España.

16 aerogeneradores tecnología AW3000 en torre de hormigón. Cliente: A.Windpower.
Junio-septiembre 2012.

Montaje Parque Eólico “las Traperas”.

Valladolid-España.

5 Aerogeneradores tecnología Mtorres.
Cliente: Mtorres.
Junio 2012.

Montaje Parque Eólico

Gostyn-Polonia.

11 aerogeneradores tecnología AW3000 en torre de hormigón.
Cliente: A. Energía.
Noviembre 2012-marzo 2013.

Montaje Parque Eólico “Chiripa”.

Costa Rica.

33 aerogeneradores tecnología AW1500 en torre metálica.
Cliente A.Energía
Septiembre 2013-enero 2014.

Montaje Parque Eólico.

Punta Plameras-Chile.

15 Aerogeneradores tecnología AW3000 torre metálica.
Cliente A.Energía.
Mayo –Octubre 2014.

Montaje Parque Eólico Cercikaya

.

Cercikaya-Turquía.

19 Aerogeneradores tecnología AW3000 torre metálica.
Cliente A.Windpower.
Noviembre 2014-Marzo 2015.

MONTAJE ELECTROMECÁNICO

P.E. AL FUJEIJ

Ash-Shoback-Jordania.

Grandes correctivos, P.E. "Ventikas".

Mexico.

2015

Supervisión P.E. South Canoe

Nova Scotia. Canada

October 2014- Marzo 2015.

Grandes correctivos Reino Unido-Escocia.

GRAN CORRECTIVO

P. E. MOVAR

HUNGRIA

Grandes correctivos Brasil.

Grandes correctivos Mexico.

Grandes correctivos Chile-Región de Choapa.

Grandes correctivos Estados Unidos-Dakota.

Grandes correctivos Estados Unidos-Montana.

Grandes correctivos Estados Unidos-Chicago.

CHICAGO, USA

Grandes correctivos Estados Unidos-Iowa.

Grandes correctivos Estados Unidos-Texas.

Grandes correctivos España.

Gran Correctivo P.E, Waubra

AUSTRALIA

GRAN CORRECTIVO P.E. TOMASZOW

POLONIA

Gran Correctivo

P. E. Yeong Yang Windfarm

Yeong Yang-Corea

AW 1500, para AE. en febrero de 2013.

Accumulated experience

Within its range of wind power industry services, AIR-RON S.L. is equipped to offer professional operational intervention with cranes, backed up by the knowledge and acquired experience of its technicians. The following list mentions the jobs in which our professionals have played an active role, intervening directly, managing operations, as well as controlling intervention logistics and organising resources:

Assembling new wind turbines

  • Assembling the “Els Escambrons” Wind Farm in Lleida, Spain. 16 AW3000 technology concrete tower wind turbines. Client: A. Windpower. June-September 2012.
  • Assembling the “Las Traperas” Wind Farm, Valladolid, Spain. 5 Mtorres technology wind turbines. Client: Mtorres. June 2012.
  • Assembling the Gostyn Wind Farm, Poland. 11 AW3000 technology concrete tower wind turbines. Client: A. Energía. November 2012 – March 2013.
  • Assembling the “Chiripa” Wind Farm, Costa Rica. 33 AW1500 technology metal tower wind turbines. Client: A. Energy. September 2013 – January 2014.
  • Electro-mechanical assembly of the Al Fujeij Wind Farm in Ash-Shoback, Jordan. TWT 1.65/82-71 IIIa. April 2014.
  • Assembling the Punta Palmeras Wind Farm, Chile. 15 AW3000 technology metal tower wind turbines. Client: A. Energy. May – October 2014.
  • Assembling the Cercikaya Wind Farm, Turkey. 19 AW3000 technology metal tower wind turbines. Client: A. Windpower. November 2014 – March 2015.

Large-scale corrective measures

Different technologies in different countries around the world: Spain, Korea, USA (Texas, Iowa, Chicago, Montana, Dakota), Chile (Choapa Region), Mexico, China, Brazil, Hungary, Australia (State of Victoria), United Kingdom (Scotland), Italy, Poland (Gostyn)…

Supervision

  • E. South Canoe, Nova Scotia. October 2014- March 2015.
  • E. Ventikas, Mexico. In progress.